Comanche South Solar is a 25.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at 268 Waring 69kV.

25.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameComanche South Solar
Queue ID18INR0047
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity25.0 MW
State
County
Point of interconnection268 Waring 69kV
Requested (queue) date2016-10-31
Proposed in-service date2019-05-31
Operational date
Withdrawn date
DeveloperLendlease Energy Development
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata