Combined cycle (alt to Q442/472) (541)

Combined cycle (alt to Q442/472) is a 431.0 MW gas interconnection project in Hampden, Massachusetts with a current status of withdrawn. It is proposed to connect at 115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond.

431.0 MWCapacity
WithdrawnStatus
WMAMarket
GasTechnology

Project facts

Canonical nameCombined cycle (alt to Q442/472)
Queue ID541
Statuswithdrawn
Source statusW
MarketWMA
TechnologyGas
Capacity431.0 MW
StateMassachusetts
CountyHampden
Point of interconnection115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond
Requested (queue) date2015-03-02
Proposed in-service date2019-03-01
Operational date
Withdrawn date2016-02-16
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata