Combined Cycle Capacity Increase (See QP #202) (225)

Combined Cycle Capacity Increase (See QP #202) is a 161.0 MW gas interconnection project in Windham, Connecticut with a current status of withdrawn. It is proposed to connect at CL&P 345 kV Lake Road substation.

161.0 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology

Project facts

Canonical nameCombined Cycle Capacity Increase (See QP #202)
Queue ID225
Statuswithdrawn
Source statusW
MarketRI
TechnologyGas
Capacity161.0 MW
StateConnecticut
CountyWindham
Point of interconnectionCL&P 345 kV Lake Road substation
Requested (queue) date2007-08-13
Proposed in-service date2013-05-31
Operational date
Withdrawn date2010-10-22
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.