Combined Cycle CNR Only (529)

Combined Cycle CNR Only is a 585.6 MW gas interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at ANP Blackstone 345kV Bus 110785 Station BLK_336.

585.6 MWCapacity
WithdrawnStatus
CMAMarket
GasTechnology

Project facts

Canonical nameCombined Cycle CNR Only
Queue ID529
Statuswithdrawn
Source statusW
MarketCMA
TechnologyGas
Capacity585.6 MW
StateMassachusetts
CountyWorcester
Point of interconnectionANP Blackstone 345kV Bus 110785 Station BLK_336
Requested (queue) date2015-02-26
Proposed in-service date2017-11-03
Operational date
Withdrawn date2017-06-26
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata