Combined Cycle Increase (354)

Combined Cycle Increase is a 20.2 MW gas interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at WMECO Doreen 19A Substation.

20.2 MWCapacity
WithdrawnStatus
WMAMarket
GasTechnology

Project facts

Canonical nameCombined Cycle Increase
Queue ID354
Statuswithdrawn
Source statusW
MarketWMA
TechnologyGas
Capacity20.2 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionWMECO Doreen 19A Substation
Requested (queue) date2011-01-12
Proposed in-service date2011-04-01
Operational date
Withdrawn date2011-02-04
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata