Combined Cycle (215)

Combined Cycle is a 578.0 MW gas interconnection project in Norfolk, Massachusetts with a current status of withdrawn. It is proposed to connect at NGRID 345 kV 344 Line.

578.0 MWCapacity
WithdrawnStatus
SEMAMarket
GasTechnology

Project facts

Canonical nameCombined Cycle
Queue ID215
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyGas
Capacity578.0 MW
StateMassachusetts
CountyNorfolk
Point of interconnectionNGRID 345 kV 344 Line
Requested (queue) date2007-05-30
Proposed in-service date2013-06-01
Operational date
Withdrawn date2008-10-27
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata