Combined Cycle (259)

Combined Cycle is a 27.0 MW gas interconnection project in Norfolk, Massachusetts with a current status of withdrawn. It is proposed to connect at 345 kV NEA Bellingham Substation.

27.0 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology

Project facts

Canonical nameCombined Cycle
Queue ID259
Statuswithdrawn
Source statusW
MarketRI
TechnologyGas
Capacity27.0 MW
StateMassachusetts
CountyNorfolk
Point of interconnection345 kV NEA Bellingham Substation
Requested (queue) date2008-05-07
Proposed in-service date2010-06-01
Operational date
Withdrawn date2009-01-28
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata