Combined Cycle (277)

Combined Cycle is a 695.0 MW gas interconnection project in Fairfield, Connecticut with a current status of withdrawn. It is proposed to connect at CL&P 345 KV 321 line.

695.0 MWCapacity
WithdrawnStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameCombined Cycle
Queue ID277
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGas
Capacity695.0 MW
StateConnecticut
CountyFairfield
Point of interconnectionCL&P 345 KV 321 line
Requested (queue) date2008-09-12
Proposed in-service date2013-06-01
Operational date
Withdrawn date2009-02-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.