Combined Cycle (442)

Combined Cycle is a 387.9 MW gas interconnection project in Hampden, Massachusetts with a current status of withdrawn. It is proposed to connect at 115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond..

387.9 MWCapacity
WithdrawnStatus
WMAMarket
GasTechnology

Project facts

Canonical nameCombined Cycle
Queue ID442
Statuswithdrawn
Source statusW
MarketWMA
TechnologyGas
Capacity387.9 MW
StateMassachusetts
CountyHampden
Point of interconnection115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond.
Requested (queue) date2014-02-26
Proposed in-service date2019-03-01
Operational date
Withdrawn date2015-12-28
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata