Combined Cycle (580)
Combined Cycle is a 1,020.0 MW gas interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at Anticipated interconnection is the National Grid 345kV line 366 between the West Farnum and Millbury substations, and/or the Eversource 345kV line 3361 between Sherman Rd and Blackstone..
Project facts
| Canonical name | Combined Cycle |
|---|---|
| Queue ID | 580 |
| Status | withdrawn |
| Source status | W |
| Market | CMA |
| Technology | Gas |
| Capacity | 1,020.0 MW |
| State | Massachusetts |
| County | Worcester |
| Point of interconnection | Anticipated interconnection is the National Grid 345kV line 366 between the West Farnum and Millbury substations, and/or the Eversource 345kV line 3361 between Sherman Rd and Blackstone. |
| Requested (queue) date | 2015-11-30 |
| Proposed in-service date | 2020-05-31 |
| Operational date | — |
| Withdrawn date | 2016-05-17 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.