Combined Cycle Upgrade #1 (526)

Combined Cycle Upgrade #1 is a 40.6 MW gas interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at Milford Power Switch DS-F3 115kV (Nat Grid # D-130-3) and Milford Power Switch DS-A3 115kV (Nat Grid # C-129-3).

40.6 MWCapacity
WithdrawnStatus
CMAMarket
GasTechnology

Project facts

Canonical nameCombined Cycle Upgrade #1
Queue ID526
Statuswithdrawn
Source statusW
MarketCMA
TechnologyGas
Capacity40.6 MW
StateMassachusetts
CountyWorcester
Point of interconnectionMilford Power Switch DS-F3 115kV (Nat Grid # D-130-3) and Milford Power Switch DS-A3 115kV (Nat Grid # C-129-3)
Requested (queue) date2015-02-26
Proposed in-service date2018-10-08
Operational date
Withdrawn date2016-09-28
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata