Combined Cycle Uprate #2 (527)

Combined Cycle Uprate #2 is a 30.0 MW gas interconnection project in Worcester, Massachusetts with a current status of operational. It is proposed to connect at Milford Power Switch DS-F3 115kV (Nat Grid #D-130-3) and Milford Power Switch DS-A3 115kV (Nat Grid #C-129-3)..

30.0 MWCapacity
OperationalStatus
CMAMarket
GasTechnology

Project facts

Canonical nameCombined Cycle Uprate #2
Queue ID527
Statusoperational
Source statusC
MarketCMA
TechnologyGas
Capacity30.0 MW
StateMassachusetts
CountyWorcester
Point of interconnectionMilford Power Switch DS-F3 115kV (Nat Grid #D-130-3) and Milford Power Switch DS-A3 115kV (Nat Grid #C-129-3).
Requested (queue) date2015-02-26
Proposed in-service date
Operational date2018-12-14
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.