Combined Reciprocating, Solar and Battery (772)

Combined Reciprocating, Solar and Battery is a 7.8 MW solar+battery interconnection project in Middlesex, Massachusetts with a current status of operational. It is proposed to connect at GRID Norman Street D substation (8W1).

7.8 MWCapacity
OperationalStatus
BOSTMarket
Solar+BatteryTechnology

Project facts

Canonical nameCombined Reciprocating, Solar and Battery
Queue ID772
Statusoperational
Source statusC
MarketBOST
TechnologySolar+Battery
Capacity7.8 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionGRID Norman Street D substation (8W1)
Requested (queue) date2018-08-07
Proposed in-service date
Operational date2019-06-03
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata