Combustion Turbine (521)

Combustion Turbine is a 109.8 MW gas interconnection project in Fairfield, Connecticut with a current status of withdrawn. It is proposed to connect at CL&P (Eversource) 115 kV Middle River Substation.

109.8 MWCapacity
WithdrawnStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameCombustion Turbine
Queue ID521
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGas
Capacity109.8 MW
StateConnecticut
CountyFairfield
Point of interconnectionCL&P (Eversource) 115 kV Middle River Substation
Requested (queue) date2015-02-17
Proposed in-service date2018-05-02
Operational date
Withdrawn date2016-03-10
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata