Combustion Turbine (537)

Combustion Turbine is a 12.0 MW gas interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at MECO 23KV Behen St feeder load side of MTR 04034085.

12.0 MWCapacity
WithdrawnStatus
BOSTMarket
GasTechnology

Project facts

Canonical nameCombustion Turbine
Queue ID537
Statuswithdrawn
Source statusW
MarketBOST
TechnologyGas
Capacity12.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionMECO 23KV Behen St feeder load side of MTR 04034085
Requested (queue) date2015-02-28
Proposed in-service date2016-11-30
Operational date
Withdrawn date2015-05-21
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.