Community Solar East (G0968)

Community Solar East is a 1.0 MW solar interconnection project in Clark, Washington with a current status of operational. It is proposed to connect at Evans Substation.

1.0 MWCapacity
OperationalStatus
WAMarket
SolarTechnology

Project facts

Canonical nameCommunity Solar East
Queue IDG0968
Statusoperational
Source statusENERGIZED
MarketWA
TechnologySolar
Capacity1.0 MW
StateWashington
CountyClark
Point of interconnectionEvans Substation
Requested (queue) date2023-10-13
Proposed in-service date
Operational date2023-12-01
Withdrawn date
DeveloperClark Public Utilities
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata