Compadre Solar (24INR0023)

Compadre Solar is a 405.7 MW solar interconnection project in Hill, Texas with a current status of operational. It is proposed to connect at tap 345kV 68090 Sam Switch - 1907 Venus.

405.7 MWCapacity
OperationalStatus
HillMarket
SolarTechnology

Project facts

Canonical nameCompadre Solar
Queue ID24INR0023
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketHill
TechnologySolar
Capacity405.7 MW
StateTexas
CountyHill
Point of interconnectiontap 345kV 68090 Sam Switch - 1907 Venus
Requested (queue) date2021-03-16
Proposed in-service date
Operational date2026-06-30
Withdrawn date
DeveloperHill Solar II, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata