Con Edison Storage LDG-01791 (LDG-01791)
Con Edison Storage LDG-01791 is a 3.7 MW battery interconnection project in Queens, New York with a current status of operational. It is proposed to connect at Glendale / 6Q81L.
3.7 MWCapacity
OperationalStatus
MaspethMarket
BatteryTechnology
Project facts
| Canonical name | Con Edison Storage LDG-01791 |
|---|---|
| Queue ID | LDG-01791 |
| Status | operational |
| Source status | Interconnected |
| Market | Maspeth |
| Technology | Battery |
| Capacity | 3.7 MW |
| State | New York |
| County | Queens |
| Point of interconnection | Glendale / 6Q81L |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2025-06-25 |
| Withdrawn date | — |
| Developer | Enel X |
| Utility / transmission owner | Con Edison |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27
Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.