Conesville 138 kV (AG2-383)

Conesville 138 kV is a 58.9 MW solar interconnection project in Coshocton, Ohio with a current status of withdrawn.

58.9 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameConesville 138 kV
Queue IDAG2-383
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity58.9 MW
StateOhio
CountyCoshocton
Point of interconnection
Requested (queue) date2021-03-29
Proposed in-service date2023-10-27
Operational date
Withdrawn date2023-09-29
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata