Coniglio Solar (62772_BTCON)

Coniglio Solar is a 123.6 MW solar interconnection project in Fannin, Texas with a current status of operational.

123.6 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameConiglio Solar
Queue ID62772_BTCON
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity123.6 MW
StateTexas
CountyFannin
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-08-01
Withdrawn date—
Developer—
Utility / transmission ownerBT Coniglio Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.