Connolly BESS (67861_CNLY)

Connolly BESS is a 125.0 MW battery interconnection project in Wise, Texas with a current status of operational.

125.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameConnolly BESS
Queue ID67861_CNLY
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity125.0 MW
StateTexas
CountyWise
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-11-01
Withdrawn date
Developer
Utility / transmission ownerBT Connolly Storage, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata