Constable BESS (67712_CSTB1)

Constable BESS is a 75.0 MW battery interconnection project in Washington, Oregon with a current status of operational.

75.0 MWCapacity
OperationalStatus
PGEMarket
BatteryTechnology

Project facts

Canonical nameConstable BESS
Queue ID67712_CSTB1
Statusoperational
Source status(OP) Operating
MarketPGE
TechnologyBattery
Capacity75.0 MW
StateOregon
CountyWashington
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-12-01
Withdrawn date—
Developer—
Utility / transmission ownerPortland General Electric

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata