COOLEY LANDING BESS (1101)

COOLEY LANDING BESS is a 20.0 MW battery interconnection project in San Mateo, California with a current status of withdrawn. It is proposed to connect at Cooley Landing 60kV Substation.

20.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameCOOLEY LANDING BESS
Queue ID1101
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyBattery
Capacity20.0 MW
StateCalifornia
CountySan Mateo
Point of interconnectionCooley Landing 60kV Substation
Requested (queue) date2015-04-30
Proposed in-service date—
Operational date—
Withdrawn date2016-04-15
Developer—
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata