COOLEY LANDING BESS (1101)

COOLEY LANDING BESS is a 20.0 MW battery interconnection project in San Mateo, California with a current status of withdrawn. It is proposed to connect at Cooley Landing 60kV Substation.

20.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameCOOLEY LANDING BESS
Queue ID1101
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity20.0 MW
StateCalifornia
CountySan Mateo
Point of interconnectionCooley Landing 60kV Substation
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2016-04-15
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.