COON CREEK (J2199)

COON CREEK is a 200.0 MW battery interconnection project in Anoka, Minnesota with a current status of withdrawn. It is proposed to connect at COON CREEK.

200.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameCOON CREEK
Queue IDJ2199
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity200.0 MW
StateMinnesota
CountyAnoka
Point of interconnectionCOON CREEK
Requested (queue) date2021-08-13
Proposed in-service date2024-09-30
Operational date2024-09-30
Withdrawn date2025-10-27
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.