Cooper - Penton 230 kV Line (J1380)

Cooper - Penton 230 kV Line is a 200.0 MW solar interconnection project in Beauregard Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Cooper - Penton 230 kV Line.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCooper - Penton 230 kV Line
Queue IDJ1380
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateLouisiana
CountyBeauregard Parish
Point of interconnectionCooper - Penton 230 kV Line
Requested (queue) date2019-04-29
Proposed in-service date2023-10-01
Operational date2023-10-01
Withdrawn date2020-07-17
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata