Cooperative Solar Three-Marion (69742_PV3)

Cooperative Solar Three-Marion is a 96.0 MW solar interconnection project in Marion, Kentucky with a current status of active.

96.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameCooperative Solar Three-Marion
Queue ID69742_PV3
Statusactive
Source status(T) Regulatory approvals received. Not under construction
MarketPJM
TechnologySolar
Capacity96.0 MW
StateKentucky
CountyMarion
Point of interconnection
Requested (queue) date
Proposed in-service date2027-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerEast Kentucky Power Coop, Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.