Copper Mountain Solar 2 is a 34.0 MW solar interconnection project in Clark, Nevada with a current status of operational.

34.0 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameCopper Mountain Solar 2
Queue ID58017_PV03
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity34.0 MW
StateNevada
CountyClark
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2012-07-01
Withdrawn date
Developer
Utility / transmission ownerRWE Clean Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.