Copperhead Solar, LLC (67019_CHSTG)

Copperhead Solar, LLC is a 100.0 MW battery interconnection project in McLennan, Texas with a current status of operational.

100.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameCopperhead Solar, LLC
Queue ID67019_CHSTG
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity100.0 MW
StateTexas
CountyMcLennan
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-09-01
Withdrawn date
Developer
Utility / transmission ownerGeronimo Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.