Copperton Solar Plant No. 1 (64427_CSP2)

Copperton Solar Plant No. 1 is a 25.0 MW solar interconnection project in Salt Lake, Utah with a current status of operational.

25.0 MWCapacity
OperationalStatus
PACEMarket
SolarTechnology

Project facts

Canonical nameCopperton Solar Plant No. 1
Queue ID64427_CSP2
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologySolar
Capacity25.0 MW
StateUtah
CountySalt Lake
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-12-01
Withdrawn date
Developer
Utility / transmission ownerKennecott Utah Copper

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata