Coral Energy Storage (C24-066)

Coral Energy Storage is a 100.0 MW battery interconnection project in Chemung, New York with a current status of active. It is proposed to connect at Yawger 115kV Substation.

100.0 MWCapacity
ActiveStatus
CMarket
BatteryTechnology

Project facts

Canonical nameCoral Energy Storage
Queue IDC24-066
Statusactive
Source status6
MarketC
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyChemung
Point of interconnectionYawger 115kV Substation
Requested (queue) date2024-08-01
Proposed in-service date
Operational date
Withdrawn date
DeveloperTransGrid Energy LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.