Corbin Russwin Phase 3 Berlin (63358_CRP3B)

Corbin Russwin Phase 3 Berlin is a 1.0 MW solar interconnection project in Hartford, Connecticut with a current status of operational.

1.0 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameCorbin Russwin Phase 3 Berlin
Queue ID63358_CRP3B
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity1.0 MW
StateConnecticut
CountyHartford
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2018-04-01
Withdrawn date—
Developer—
Utility / transmission ownerPowerflex

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata