Cornell CHPP (0230)
Cornell CHPP is a 30.0 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at Maple Ave. Substation 115kV.
30.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology
Project facts
| Canonical name | Cornell CHPP |
|---|---|
| Queue ID | 0230 |
| Status | withdrawn |
| Source status | 0 |
| Market | — |
| Technology | Gas |
| Capacity | 30.0 MW |
| State | New York |
| County | — |
| Point of interconnection | Maple Ave. Substation 115kV |
| Requested (queue) date | 2006-11-02 |
| Proposed in-service date | 2006-11-21 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Cornell University |
| Utility / transmission owner | NYISO |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.