Corpus Refinery (50026_SOLAR)

Corpus Refinery is a 27.5 MW solar interconnection project in Nueces, Texas with a current status of operational.

27.5 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameCorpus Refinery
Queue ID50026_SOLAR
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity27.5 MW
StateTexas
CountyNueces
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-07-01
Withdrawn date
Developer
Utility / transmission ownerFlint Mine Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata