Cortland is a 2.0 MW solar interconnection project in Dekalb, Illinois with a current status of operational.

2.0 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameCortland
Queue ID63949_CORT2
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity2.0 MW
StateIllinois
CountyDekalb
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-05-01
Withdrawn date—
Developer—
Utility / transmission ownerCortland Solar 2 LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata