Cos Cob (542_un14)

Cos Cob is a 20.0 MW other interconnection project in Fairfield, Connecticut with a current status of operational.

20.0 MWCapacity
OperationalStatus
ISNEMarket
OtherTechnology

Project facts

Canonical nameCos Cob
Queue ID542_un14
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyOther
Capacity20.0 MW
StateConnecticut
CountyFairfield
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2008-06-01
Withdrawn date—
Developer—
Utility / transmission ownerConnecticut Jet Power LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata