Cosper Solar (67773_GRS20)

Cosper Solar is a 148.2 MW solar interconnection project in Bell, Texas with a current status of active.

148.2 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameCosper Solar
Queue ID67773_GRS20
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketERCO
TechnologySolar
Capacity148.2 MW
StateTexas
CountyBell
Point of interconnection
Requested (queue) date
Proposed in-service date2027-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGransolar Texas Twenty Two

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata