Cosper Solar (25INR0281)

Cosper Solar is a 148.2 MW solar interconnection project in Bell, Texas with a current status of operational. It is proposed to connect at Tap 138kV 115 Ding Dong - 3630 Copperas Cove Tu .

148.2 MWCapacity
OperationalStatus
BellMarket
SolarTechnology

Project facts

Canonical nameCosper Solar
Queue ID25INR0281
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBell
TechnologySolar
Capacity148.2 MW
StateTexas
CountyBell
Point of interconnectionTap 138kV 115 Ding Dong - 3630 Copperas Cove Tu
Requested (queue) date2023-01-03
Proposed in-service date
Operational date2027-11-12
Withdrawn date
DeveloperGransolar Texas Twenty Two
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.