Cotton Energy Center (12INR0009)

Cotton Energy Center is a 875.0 MW gas interconnection project with a current status of withdrawn.

875.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameCotton Energy Center
Queue ID12INR0009
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyGas
Capacity875.0 MW
State
County
Point of interconnection
Requested (queue) date2007-12-18
Proposed in-service date2050-12-31
Operational date
Withdrawn date
DeveloperFPL
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata