Coyote is a 200.0 MW solar interconnection project in Oliver, North Dakota with a current status of withdrawn. It is proposed to connect at Coyote.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCoyote
Queue IDJ3182
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateNorth Dakota
CountyOliver
Point of interconnectionCoyote
Requested (queue) date2022-09-11
Proposed in-service date2027-06-01
Operational date2027-06-01
Withdrawn date2023-02-16
Developer
Utility / transmission ownerMONTANA-DAKOTA UTILITIES CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.