The interXdata warehouse tracks 19 interconnection projects in Oliver, North Dakota, representing 4,612 MW of requested capacity.

19Total projects
2Active
8Operational
9Withdrawn
4,612 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind142,624 MW
Other31,189 MW
Coal1600 MW
Solar1200 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project G581 — Coal in Oliver, North DakotaG581Coal600.0 MWwithdrawnOliver, North Dakota
MISO Queue Project H082 — Wind in Oliver, North DakotaH082Wind500.0 MWwithdrawnOliver, North Dakota
Milton R Young2823_2Other477.0 MWoperationalOliver, North Dakota
ND Queue Project MPC01300 — Other in Oliver, North DakotaMPC01300Other455.0 MWoperationalOliver, North Dakota
ND Queue Project MPC01600 — Wind in Oliver, North DakotaMPC01600Wind399.6 MWwithdrawnOliver, North Dakota
ND Queue Project MPC04000 — Wind in Oliver, North DakotaMPC04000Wind300.0 MWactiveOliver, North Dakota
Milton R Young2823_1Other257.0 MWoperationalOliver, North Dakota
Basin Electric 230 kVGEN-2016-004Wind202.0 MWactiveOliver, North Dakota
MISO Queue Project J511 — Wind in Oliver, North DakotaJ511Wind200.0 MWwithdrawnOliver, North Dakota
CoyoteJ3182Solar200.0 MWwithdrawnOliver, North Dakota
Square Butte 230 kV Substation EastJ2080Wind200.0 MWwithdrawnOliver, North Dakota
Oliver Wind IV67502_GEN4Wind198.8 MWoperationalOliver, North Dakota
Square Butte 230 kV Substation EastJ1888Wind175.0 MWwithdrawnOliver, North Dakota
ND Queue Project MPC02400 — Wind in Oliver, North DakotaMPC02400Wind149.5 MWwithdrawnOliver, North Dakota
ND Queue Project MPC02100 — Wind in Oliver, North DakotaMPC02100Wind100.0 MWoperationalOliver, North Dakota
FPL Energy Oliver Wind I LLC56392_1Wind50.6 MWoperationalOliver, North Dakota
MISO Queue Project G502 — Wind in Oliver, North DakotaG502Wind50.0 MWoperationalOliver, North Dakota
MISO Queue Project G659 — Wind in Oliver, North DakotaG659Wind50.0 MWwithdrawnOliver, North Dakota
FPL Energy Oliver Wind II LLC56573_2Wind48.0 MWoperationalOliver, North Dakota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; minnkota-oasis; MISO — generator interconnection queue; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Oliver County.

Start tracking with interXdata