CPV CALIFORNIA VII (235)

CPV CALIFORNIA VII is a 630.0 MW gas interconnection project in Contra Costa, California with a current status of withdrawn. It is proposed to connect at Tesla-Tracy #1 230kV line.

630.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameCPV CALIFORNIA VII
Queue ID235
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyGas
Capacity630.0 MW
StateCalifornia
CountyContra Costa
Point of interconnectionTesla-Tracy #1 230kV line
Requested (queue) date2007-06-29
Proposed in-service date—
Operational date—
Withdrawn date2008-11-26
Developer—
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata