CPV Capon Springs Wind is a 150.0 MW wind interconnection project in Hampshire, West Virginia with a current status of active. It is proposed to connect at Meadowbrook-Greenland Gap 500kV.
150.0 MWCapacity
ActiveStatus
PJMMarket
WindTechnology
Project facts
| Canonical name | CPV Capon Springs Wind |
|---|---|
| Queue ID | AH1-387 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Wind |
| Capacity | 150.0 MW |
| State | West Virginia |
| County | Hampshire |
| Point of interconnection | Meadowbrook-Greenland Gap 500kV |
| Requested (queue) date | 2025-01-30 |
| Proposed in-service date | 2025-01-09 |
| Operational date | — |
| Withdrawn date | — |
| Developer | CPV Valley, LLC |
| Utility / transmission owner | APS |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.