Craig 345 Substation (GI-DISIS-2022-44)
Craig 345 Substation is a 199.0 MW solar interconnection project in Moffat County, Colorado with a current status of active. It is proposed to connect at Craig 345 Substation.
199.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology
Project facts
| Canonical name | Craig 345 Substation |
|---|---|
| Queue ID | GI-DISIS-2022-44 |
| Status | active |
| Source status | IA FULLY EXECUTED/ON SUSPENSION |
| Market | CO |
| Technology | Solar |
| Capacity | 199.0 MW |
| State | Colorado |
| County | Moffat County |
| Point of interconnection | Craig 345 Substation |
| Requested (queue) date | 2022-05-31 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | TSGT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata