Craig - Meeker 345 Line (GI-CS-2025-17)

Craig - Meeker 345 Line is a 199.5 MW solar interconnection project in Moffat County,, Colorado with a current status of withdrawn. It is proposed to connect at Craig - Meeker 345 Line.

199.5 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology

Project facts

Canonical nameCraig - Meeker 345 Line
Queue IDGI-CS-2025-17
Statuswithdrawn
Source statusWITHDRAWN
MarketCO
TechnologySolar
Capacity199.5 MW
StateColorado
CountyMoffat County,
Point of interconnectionCraig - Meeker 345 Line
Requested (queue) date2025-09-26
Proposed in-service date2029-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tristate-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-22operational_date2029-06-01—medium
2026-09-22proposed_online_date—2029-06-01medium
2026-09-22statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.