Craig - Meeker 345 Line (GI-CS-2025-17)
Craig - Meeker 345 Line is a 199.5 MW solar interconnection project in Moffat County,, Colorado with a current status of withdrawn. It is proposed to connect at Craig - Meeker 345 Line.
199.5 MWCapacity
WithdrawnStatus
COMarket
SolarTechnology
Project facts
| Canonical name | Craig - Meeker 345 Line |
|---|---|
| Queue ID | GI-CS-2025-17 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | CO |
| Technology | Solar |
| Capacity | 199.5 MW |
| State | Colorado |
| County | Moffat County, |
| Point of interconnection | Craig - Meeker 345 Line |
| Requested (queue) date | 2025-09-26 |
| Proposed in-service date | 2029-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | TSGT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tristate-oasis. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-22 | operational_date | 2029-06-01 | — | medium |
| 2026-09-22 | proposed_online_date | — | 2029-06-01 | medium |
| 2026-09-22 | status | operational | withdrawn | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.