Crandall 345 kV Substation (J1349)

Crandall 345 kV Substation is a 335.0 MW solar interconnection project in Cottonwood County, Minnesota with a current status of withdrawn. It is proposed to connect at Crandall 345 kV Substation.

335.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCrandall 345 kV Substation
Queue IDJ1349
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity335.0 MW
StateMinnesota
CountyCottonwood County
Point of interconnectionCrandall 345 kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2023-04-20
Operational date2023-04-20
Withdrawn date2022-02-22
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.