Crape Myrtle Solar (28INR0531)

Crape Myrtle Solar is a 140.7 MW solar interconnection project in Ellis, Texas with a current status of active. It is proposed to connect at Tap 345 kV 2255 OLDCNTRY_5 - 3376 NOTUS_5.

140.7 MWCapacity
ActiveStatus
EllisMarket
SolarTechnology

Project facts

Canonical nameCrape Myrtle Solar
Queue ID28INR0531
Statusactive
Source statusSS Started, FIS Started, No IA
MarketEllis
TechnologySolar
Capacity140.7 MW
StateTexas
CountyEllis
Point of interconnectionTap 345 kV 2255 OLDCNTRY_5 - 3376 NOTUS_5
Requested (queue) date
Proposed in-service date2028-06-15
Operational date
Withdrawn date
DeveloperCrape Myrtle Solar LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata