Crawford Solar (GI-164)

Crawford Solar is a 160.0 MW solar+battery interconnection project in Crawford County, Georgia with a current status of active. It is proposed to connect at Dorsett(GTC)-Thomaston 230 kV TL.

160.0 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCrawford Solar
Queue IDGI-164
Statusactive
Source statusSystem Impact Study
MarketGA
TechnologySolar+Battery
Capacity160.0 MW
StateGeorgia
CountyCrawford County
Point of interconnectionDorsett(GTC)-Thomaston 230 kV TL
Requested (queue) date2022-06-07
Proposed in-service date2025-10-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.