Crawford Solar Restudy (GI-223)

Crawford Solar Restudy is a 160.0 MW solar+battery interconnection project in Crawford County, Georgia with a current status of active. It is proposed to connect at Dorsett(GTC)-Thomaston 230 kV TL.

160.0 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCrawford Solar Restudy
Queue IDGI-223
Statusactive
Source statusApplication under Review
MarketGA
TechnologySolar+Battery
Capacity160.0 MW
StateGeorgia
CountyCrawford County
Point of interconnectionDorsett(GTC)-Thomaston 230 kV TL
Requested (queue) date2026-04-02
Proposed in-service date2029-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.