Creekfield Solar (22INR0266)

Creekfield Solar is a 161.3 MW solar interconnection project in Fort Bend, Texas with a current status of withdrawn.

161.3 MWCapacity
WithdrawnStatus
Fort BendMarket
SolarTechnology

Project facts

Canonical nameCreekfield Solar
Queue ID22INR0266
Statuswithdrawn
Source status—
MarketFort Bend
TechnologySolar
Capacity161.3 MW
StateTexas
CountyFort Bend
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-09-14
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-30withdrawn_date—2026-09-14high
2026-10-30statussuspendedwithdrawnhigh
2026-07-31new_project—suspendedhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata