Crescent Ridge-Corbin 138 kV (AF2-128 - moved to TC1)

Crescent Ridge-Corbin 138 kV is a 79.5 MW wind interconnection project in Lasalle, Illinois with a current status of withdrawn.

79.5 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameCrescent Ridge-Corbin 138 kV
Queue IDAF2-128 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity79.5 MW
StateIllinois
CountyLasalle
Point of interconnection—
Requested (queue) date2020-02-28
Proposed in-service date2024-08-26
Operational date—
Withdrawn date2024-06-25
Developer—
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata